Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    “Why Is the LRA Boss Erasing ArcelorMittal’s US$200M Lifeline? —

    November 13, 2025

    Dismissed NPHIL Boss drags Pres. Boakai to court over Violation of NPHIL statutes 

    November 13, 2025

    PERSPECTIVE: Liberia’s War and Economic Crimes Court – Dead on Arrival

    November 13, 2025
    Facebook X (Twitter) Instagram
    • Health
    • Business
    • Finance
    • Education
    Facebook X (Twitter) Instagram Pinterest YouTube
    Independent Probe News
    • Home
    • Judiciary
    • International
    • Politics
    • Picks
    • Opinion
    Subscribe
    Independent Probe News
    Home » Monrovia-Bo-waterside four Lane Road Construction Begins September 2025
    Development

    Monrovia-Bo-waterside four Lane Road Construction Begins September 2025

    Austine NewmanBy Austine NewmanJuly 25, 2025No Comments3 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    The Liberian Government announces the commencement of the construction of the road from Monrovia to Bo-waterside   early September 2025.

    According to Information Minister Piah, the expansion of the road leading from Clay, Bomi County to Bo-Waterside, Grand Cape Mount shall also be added to four lanes.

    According to Information Minister Piah, once completed, for the first time from Freeport to Bo-Waterside will now be four lanes.

    In 2016, the Government of Liberia in partnership with the European Union launched the first postwar maintenance program for asphalt paved road. The maintenance program was launched on Tuesday, May 10, 2016 at Klay Junction, Bomi County.

    The program is expected to last for 5-year and its objective is to perform routine maintenance on the Bo-Waterside Highway after more than two decades of intensive utilization without maintenance. The road maintenance project is being funded by the European Union and United Kingdom under a project called “Build-Up Capacity and Preparedness of the Ministry of Public Works” through a European Union Grant.

    The total cost of the project is put at US$1,502,295.48, and a local contractor, West Africa Construction Incorporated is the implementing contractor. The Monrovia-Bo-Waterside Highway was originally constructed in the mid-80s by a South Korean Company, Daewoo. The entire road length is 116.9kilometer and is currently one of Liberia’s best international highways. It connects Liberia with the Republic of Sierra Leone and also serves as one of the main trade routes between the two countries.

    Speaking at the site turning over ceremony, Deputy Public Works Minister for Technical Services, Claude E. Langley said planning activities marking the commencement of the project started in 2014 following the signing of the agreement. He said the road maintenance program will be implemented in two phases. Phase one; he said entails cutting of vegetation along the road, cleaning of drainages, shoulder restoration and patching of potholes, among others. While phase two entails the initial repair work which includes maintenance of bad spots, failed/critical sections which according to him is required before the start of heavy rains.

    This aspect, the Deputy Public Works Minister noted is expected to be completed before June of this year to avoid what he termed as further “defects”. “Our intent is to address all the critical sections of the road before the end of June when the rains will be very heavy and much work cannot be done”, the Works Technical Boss emphasized. For her part, European Union Ambassador to Liberia, Tiina Intelmann, added that the contract will repair potholes, cut grass and clean ditches to ensure that the road corridor remains functional. She disclosed that the European Union was working with the Ministry of Public Works to develop their capacity to manage road maintenance in the long term-even after the end of the current five years project.

    The Monrovia to Bo Waterside road in Liberia, a vital highway connecting the capital to the Sierra Leone border, was originally constructed in the mid-1980s by a South Korean company, Daewoo. The 116.9 kilometer road was part of a larger effort to develop Liberia’s road network, which largely took place in the 1970s and early 1980s with funding from the World Bank. After decades of heavy use and lack of maintenance, particularly during and after the civil war, the road underwent a routine maintenance program funded by the European Union and the United Kingdom, launched in 2016. 

    Loading

    Related

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous Article𝐋𝐏𝐂𝐌 𝐄𝐱𝐞𝐜𝐮𝐭𝐢𝐯𝐞 𝐒𝐭𝐞𝐞𝐫𝐢𝐧𝐠 𝐂𝐨𝐦𝐦𝐢𝐭𝐭𝐞𝐞 𝐂𝐨𝐧𝐯𝐞𝐧𝐞𝐬 𝐈𝐧𝐚𝐮𝐠𝐮𝐫𝐚𝐥 𝐒𝐞𝐬𝐬𝐢𝐨𝐧 𝐚𝐧𝐝 𝐂𝐨𝐧𝐬𝐭𝐢𝐭𝐮𝐭𝐞𝐬 𝐊𝐞𝐲 𝐒𝐮𝐛𝐜𝐨𝐦𝐦𝐢𝐭𝐭𝐞𝐞𝐬
    Next Article Fula women protest after police allegedly strip muslim woman’s headscarf during arres
    Austine Newman
    • Website

    Related Posts

    “Why Is the LRA Boss Erasing ArcelorMittal’s US$200M Lifeline? —

    November 13, 2025

    EECAF Urges Passage of Climate Change Act to Secure Liberia’s Environmental Future

    November 13, 2025

    Nimba County Day Postponed Following Senator Kogar’s Request

    November 12, 2025

    Comments are closed.

    Editors Picks

    SENATE POST AND TELECOMMUNICATIONS COMMITTEE BEGINS HEARING INTO ACCUSATION FROM SHAREHOLDERS OF Lonestar Cell MTN Mobile Money

    May 29, 2025

    MPC Leader Freeman Pledges Support for Youth in Grand Bassa, Eyes 2030 Presidential Run

    September 24, 2025

    Tornorlah Varpilah  In Hot Water Over Totota Tanker Explosion Disaster Funds Management, But……………

    December 31, 2024

    LIBERIA: 12% Reduction in Electricity Tariffs for Bong and Nimba Counties – LERC Announces

    January 6, 2025
    Top Reviews

    Youth Group Runs to Simeon Freeman’s Defense

    By Chester Smith

    Youth Empowered by Eco-Brigade Initiative in Gbarpolu and Rivercess

    By Austine Newman

    Yarkpah Town Welcomes Newly Constructed Solar-Powered Water Facility

    By Chester Smith
    Advertisement
    Demo
    Our Picks

    “Why Is the LRA Boss Erasing ArcelorMittal’s US$200M Lifeline? —

    November 13, 2025

    Dismissed NPHIL Boss drags Pres. Boakai to court over Violation of NPHIL statutes 

    November 13, 2025

    PERSPECTIVE: Liberia’s War and Economic Crimes Court – Dead on Arrival

    November 13, 2025

    EECAF Urges Passage of Climate Change Act to Secure Liberia’s Environmental Future

    November 13, 2025
    • Facebook
    • Twitter
    • Instagram
    • Pinterest
    Don't Miss

    NPP Chairman Blast Gov’t Over Halting CMC Gbarnga Bridge Project

    By Chester SmithNovember 12, 2025

    IPNEWS:  The Chairman of the National Patriotic Party (NPP), Atty. George Sylvester Mulbah, has voiced…

    Loading

    President Boakai Make Gains to solidify stable electricity for Dry season

    November 11, 2025

    AU, ECOWAS & EU Reject U.S. Threats in Nigeria

    November 10, 2025

    “Weah Still Holds the Magic” Stanton Witherspoon Warns UP Against Political Complacency

    November 10, 2025
    Copyright © 2024. Designed by Austine Newman.
    • Home
    • Judiciary

    Type above and press Enter to search. Press Esc to cancel.